欧美日本一线视频,狼友视频少妇向日的日子,欧美猛交ⅹxxx乱大交视频,一级不卡中文字幕精品片

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:2102

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
黄龙县| 惠水县| 方山县| 齐河县| 淮北市| 临汾市| 电白县| 青海省| 独山县| 镇安县| 侯马市| 聊城市| 武汉市| 广德县| 汾阳市| 固阳县| 夹江县| 南涧| 怀远县| 延安市| 临桂县| 梧州市| 团风县| 琼海市| 井冈山市| 鄂托克旗| 湘阴县| 朝阳区| 高密市| 灌阳县| 永年县| 蓬溪县| 青阳县| 当涂县| 罗甸县| 兴文县| 隆德县| 峨边| 镇沅| 自贡市| 德昌县|